Project: LTA CRPO-91

Client:                 Saipem
Location:            Gulf Region, KSA
Date:                   2024
Drill rig:              PBA 818 (Saipem Owned)
Foundation:      Main Piles 42”

Project: LTA CRPO-91, ABSF 260/269, 505.

Jacket 4 legs with 42” main piles and 11no. 30” conductor piles, including UR:

  • UR 914 – 1067mm
  • UR 654 – 762mm
Scroll to Top